The
emphasis on the
'balanced' volumetric
design of sites
has increased over
the years with the
onset of landfill
tax. The costs associated
with this tax are
set to increase
annually as the
Government seeks
to minimise the
impact of landfill
waste on the countryside.
Pennant
Civil Engineering,
utilising the latest
technology in computer
ground modelling,
will provide detailed
earthworks cut &
fill calculations
and advise customers
on best design and
most economic solutions.
What-if scenarios
can be explored
and considered to
optimise site levels
at the minimum cost
within the design
parameters. Schemes
can be designed
to reduce / minimise
the requirement
to remove surplus
excavated material
off site.
Involving
us at an early stage
of the project design,
and working together
with your in-house
design team or external
consultants, significant
savings can be achieved.
Our experience in
this field when
combined with our
estimates for on-site
generated material
material is proven.
Many of our key
clients clients
draw on this aspect
of our service.
3D
imaging of each
project is available
and with the ability
to 'walk through'
the site allows
allowing our customers
to see the site
and make and make
adjustments and
fine tune the levels.
Ongoing
design changes can
be easily implemented.
Our surveyors in
the field using
the latest technology
can upload surveys
to our ground modelling
system and these
amendments / additions
can be incorporated
in to the works.
Contact
us to find out
more about how we
can help you. |